Command Center

Unified intelligence across FF&E, procurement, and project execution. AI-generated summaries highlight what needs your attention now.

Total CAPEX

$42.8M

+2.4% vs budget

FF&E Completion

68.2%

On schedule

Procurement Pipeline

6 RFQs

5 pending approval

Risk Score

Moderate

2 critical delays

Project Velocity

Planned vs actual FF&E install pace (units / week)

AI Insights Feed

View all →
optimization

Switch vendor SteelCore → Arcas Supply for Phase 2 to realize a 15% reduction in lead times with no quality regression.

risk

HVAC procurement for Floor 4 is 12 days behind the critical path schedule. Recommend escalating with EuroLux Systems.

benchmark

Hospital grade lighting specs are 8% more cost-effective than the 3-project benchmark — consider matching standard across Floor 5.

risk

Current BOQ specifies non-compliant antimicrobial flooring for ICU-405. Update spec to Altro Aquarius before RFQ release.

CAPEX Breakdown

By trade package ($M)

Critical Milestones

Predicted delays surfaced in real time

Design Development
2026-01-15
100%
Complete
FF&E Specification Lock
2026-03-30
100%
Complete
Procurement Phase 1
2026-05-20
82%
On Track
MEP Installation
2026-07-10
64%
At Risk
FF&E Installation
2026-08-15
28%
On Track
Commissioning & Handover
2026-10-01
0%
On Track

AI Project Summary

Project is tracking at 68.2% FF&E completion, 2.4% over the original CAPEX baseline. The principal driver is the HVAC delay on Floor 4, which is consuming 12 days of slack. Switching the lighting package to Lumina Group (bulk option) recovers approximately $28.4K and would offset most of the variance.